|
|
Fort Union Gas Gathering System Map
- 106 miles, 24-inch high pressure
gathering system with a maximum operating pressure of 1440 psig.
- CO2 treating facility located
at the southern end of the system.
- Initial capacity of 435 MMcf
per day, expanded to 634 MMcf per day.
- Interconnections include CIG
Powder River Lateral, WIC Medicine Bow Lateral, and KMI Pipeline.
|